Ask the Community
Groups
Power On Sequence for new RXDA chasssis (dec 2020) - Connect IT Community | Kaseya
<main> <article class="userContent"> <p>Starting in December 2020, Unitrends began issuing a new model of RXDA Archive Chassis. This chassis has a unique power on sequence that might seem confusing. This process was included in the packaging with these new units but is also copied here. </p> <h2 data-id="power-up-sequences"> <br><strong>Power up Sequences:</strong> </h2> <h3 data-id="first-use-on-power-cord-connection">First Use on Power Cord Connection</h3> <ol><li>Plug power cords into rear of unit</li> <li>Wait until blue info panel blinks on left front of unit (up to 1 min)</li> <li>Press power button on right of front panel once</li> <li>Power up should begin in approx 3 seconds</li> </ol><h3 data-id="power-down-sequence">Power Down Sequence:</h3> <ol><li>Hold the power button on the unit. the blue info button will start to blink after a few seconds</li> <li>continue holding the power button until the blue light stops blinking</li> <li>Release the power button</li> <li>Unit will begin shutdown approx 10 seconds later</li> </ol><h3 data-id="after-a-normal-shutdown">After a normal shutdown:</h3> <ol><li>Press power button on right of front panel once</li> <li>Power up should begin in approx 3 seconds</li> </ol><h3 data-id="after-a-power-loss-event">After a Power Loss event:</h3> <p>If the unit was on when power was lost, it should automatically reboot approx 15 seconds after power is restored. </p> </article> </main>